Statistics & probability

Single acceptance sampling operating characteristic calculator

An acceptance-sampling plan can accept a poor lot or reject a good one because it inspects only a sample.

Your numbers

Calculated on your device. Your inputs aren’t sent to us.

Your result

Ready when you are

Enter your inputs and select Calculate.

Try it, understand it

Explore the result

An acceptance-sampling plan can accept a poor lot or reject a good one because it inspects only a sample. Its operating-characteristic curve shows how acceptance probability changes with the lot’s defective fraction.

Worked example comparison
ExampleOutputWhat to notice
Worked exampleLot acceptance probability at entered fraction0.736099With n equal to ten, c equal to one and defective fraction 0.1, acceptance includes zero or one defective unit. Its probability is 0.9^10 plus ten times 0.1 times 0.9^9. The result is about 0.736099. At defective fraction zero the acceptance probability is one; with every unit defective and c below n it is zero.
Compare a changed assumptionLot acceptance probability at entered fraction0.391747Inspect a larger sample at unchanged acceptance count and compare the risk curve.

Check your understanding

Does accepting a sample mean the complete lot is defect free?

No. The OC curve explicitly includes acceptance probability at nonzero defective fractions.

Predict the comparison before running it

Inspect a larger sample at unchanged acceptance count and compare the risk curve.

Behind the numbers

How this calculation works

An acceptance-sampling plan can accept a poor lot or reject a good one because it inspects only a sample. Its operating-characteristic curve shows how acceptance probability changes with the lot’s defective fraction. This page evaluates a single attributes plan and two risk points. It keeps the sample size, acceptance count and assumed quality fractions visible instead of presenting acceptance as a certainty.

THE FORMULAPa(p) = Σ from d=0 to c choose(n,d) p^d (1−p)^(n−d)

A worked example

With n equal to ten, c equal to one and defective fraction 0.1, acceptance includes zero or one defective unit. Its probability is 0.9^10 plus ten times 0.1 times 0.9^9. The result is about 0.736099. At defective fraction zero the acceptance probability is one; with every unit defective and c below n it is zero.

Good to know

No standard inspection-plan selection, switching rules or double sampling is implemented. The tool evaluates the plan you enter and does not declare it compliant with a procurement standard. Accepted lots can still contain defective units. This probability calculation is not lot certification, a safety assurance or an instruction to omit required inspection.

What this calculation answers

An acceptance-sampling plan can accept a poor lot or reject a good one because it inspects only a sample. Its operating-characteristic curve shows how acceptance probability changes with the lot’s defective fraction.

This page evaluates a single attributes plan and two risk points. It keeps the sample size, acceptance count and assumed quality fractions visible instead of presenting acceptance as a certainty.

The Binomial probability calculator supplies the underlying fixed-probability count model. An acceptance plan adds an explicit decision threshold and producer/consumer quality points.

Use the right input conventions

Enter defective units, not the total number of defects found on those units. The lot fractions use zero to one, so one percent is 0.01. The plan accepts when the observed defective count is at most c.

The binomial model assumes independent sampling from a sufficiently large lot. A small finite lot sampled without replacement needs a hypergeometric analysis rather than this same curve.

Interpret the result

Producer risk is the probability of rejecting at the entered good-quality fraction. Consumer risk is the probability of accepting at the poor-quality fraction. Their labels describe two specific assumptions, not universal supplier or customer risks.

Changing c generally shifts both risks, so a more permissive plan cannot be described as unconditionally better. The full curve helps show the tradeoff that one point estimate conceals.

Work through the example

With n equal to ten, c equal to one and defective fraction 0.1, acceptance includes zero or one defective unit. Its probability is 0.9^10 plus ten times 0.1 times 0.9^9.

The result is about 0.736099. At defective fraction zero the acceptance probability is one; with every unit defective and c below n it is zero.

Where the model stops

No standard inspection-plan selection, switching rules or double sampling is implemented. The tool evaluates the plan you enter and does not declare it compliant with a procurement standard.

Accepted lots can still contain defective units. This probability calculation is not lot certification, a safety assurance or an instruction to omit required inspection.

A few questions, answered

Does accepting a sample mean the complete lot is defect free?

No. The OC curve explicitly includes acceptance probability at nonzero defective fractions.

What changes in the comparison?

Inspect a larger sample at unchanged acceptance count and compare the risk curve.