Land & plots

Segmented fence materials and cost calculator

Count shared posts across fence runs and gates, estimate wire or mesh stock, and price an explicitly entered materials scenario.

Your numbers

1–100 rows, for example A B 20 fence or B C 3 gate 6000. Reuse an ID only for the same physical post. IDs are case-sensitive, start with a letter and have at most 16 letters/digits/_/-. Positive lengths ≤1,000,000; an optional gate cost is INR per opening, not per length. Omitted gate cost is zero. No closing run is invented.
Your design assumption, not a spacing recommendation. Interior posts subdivide each fence row into equal spans at or below this value.
Entered assumption, plain decimal up to 6 places.
Applied to net wire/mesh length before stock rounding, not to the post count. Covers only the allowance you choose.
Entered assumption, plain decimal up to 6 places.
Entered assumption, plain decimal up to 6 places.
Entered assumption, plain decimal up to 6 places.
Entered assumption, plain decimal up to 6 places.
Entered assumption, plain decimal up to 6 places.
Entered assumption, plain decimal up to 6 places.
Entered assumption, plain decimal up to 6 places.
Entered assumption, plain decimal up to 6 places.

Calculated on your device. Your inputs aren’t sent to us.

Your result

Ready when you are

Enter your numbers and select Calculate.

Try it, understand it

Explore the result

Compare a deliberate shared endpoint, a gate opening and a mesh purchase assumption. Each example sets its own entered prices; none is a product or spacing recommendation.

Worked example comparison
ExampleOutputWhat to notice
Two runs separated by a gateUnique posts in this model13The 20 m and 12 m fenced runs contribute nine interior posts; four named endpoints give thirteen posts. The 3 m gate opening receives no ordinary infill.
Two runs sharing B with no gateUnique posts in this model12A–B and B–C have only three named endpoints. With the same nine interior posts, the total is twelve.
One full-height mesh stripUnique posts in this model1332 m net plus 10% gives 35.2 m, so one 50 m roll is enough under pooled-stock assumptions. At entered height 1.5 m the net mesh area is 48 m².

Check your understanding

If three rows mention endpoint B, how many named posts does B contribute?

One, if all three references intentionally mean the same physical post. Its suitability for the junction is not checked.

Are 128 m net wire and three 50 m coils the same quantity?

No. Net wire excludes the entered allowance and stock rounding. Three coils supply 150 m, which includes both the allowance and remaining purchase excess.

Behind the numbers

How this calculation works

Count each named endpoint once, even when multiple runs meet there. Classify endpoints touching gates separately for costing. Add only the interior posts needed within each fenced run; gates receive no ordinary line posts or infill. Convert pooled wire/mesh length into whole stock units and show a budget from your own prices, gate allowances, labor and extras.

THE FORMULAPosts = unique named endpoints + Σ[ceil(fenced run / maximum spacing) − 1]; stock = ceil(allowance-adjusted infill / stock length)

A worked example

A–B is 20 m fenced, B–C a 3 m gate, and C–D 12 m fenced. At maximum spacing 3 m, the runs need 6 and 3 interior posts. Four unique endpoints give 13 posts total. Four wire courses need 128 m net, or 140.8 m with 10% allowance: three 50 m coils. With the example’s entered prices, the budget is ₹22,850 before any separately added contingency.

Good to know

A named-endpoint quantity model, not a geometric survey or structural design. Shared IDs assume one suitable physical post; duplicate endpoint pairs and self-edges are rejected. No brace/foundation/fitting design, market pricing, tax, gate support suitability or recommended spacing. Pooled stock assumes joins and offcut reuse; no guaranteed no-splice cutting plan. Gate rows do not receive ordinary infill or interior line posts.

Name shared posts before adding the run counts

The fence post calculator handles one straight, open-ended run. A site with several runs needs another decision: which endpoint locations are the same physical post? This planner makes that sharing explicit with names such as A, B and C. Reusing B in two rows means one named post at B, not two posts merely because two rows mention it.

For example, A–B is a 20 m fenced run, B–C is a 3 m gate opening, and C–D is a 12 m fenced run. At an entered maximum spacing of 3 m, the first fenced run needs seven spans and six interior posts. The second needs four spans and three interior posts. The four named endpoint locations A, B, C and D bring the total to thirteen posts.

The gate is not a fenced run shortened by three metres. Its endpoints B and C still need to exist, while the opening receives no ordinary line posts or wire/mesh infill in this model. Both B and C use the entered gate-post price class, even though each also touches a fence row. No segment is added automatically to close a boundary.

The fence post calculator counts one open-ended straight run. Segmented fence materials instead count explicitly shared endpoints once and keep gate openings separate from ordinary infill.

Separate net material from what a supplier sells

The example has 32 m of fenced runs. Four wire courses require 128 m net. An entered 10% infill allowance raises that requirement to 140.8 m; three 50 m coils provide 150 m. The remaining 9.2 m is stock above the allowance-adjusted need. It is different from the 12.8 m allowance already included in that need.

Mesh mode uses one full-height strip along the fenced length. Enter the chosen roll’s height to report net mesh area, and enter its length for the roll count. The page does not stack short rolls to achieve a greater height or decide that a particular mesh height is suitable. Wire-course count is disabled in mesh mode so it cannot multiply the mesh quantity accidentally.

Stock is pooled across the site: this quantity model allows joins and reuse of offcuts. A rule that every run must come from an unbroken coil, or that offcuts cannot move between runs, can require more stock. The skirting and trim cut planner solves a separate straight-piece cutting problem with its own kerf and stock assumptions; it should not be mistaken for a fencing installation design.

Use the cost breakdown to check what is still missing

The example prices are editable assumptions. Nine interior posts at ₹350, two non-gate endpoint posts at ₹800, two gate endpoints at ₹1,500, three coils at ₹2,500, a ₹6,000 gate-row allowance and 32 m of labor at ₹50 give ₹22,850. A 5% contingency on that subtotal would add ₹1,142.50. These are worked arithmetic, not local quotations.

Each gate row can carry its own optional INR amount. An omitted amount is zero, which means the budget includes no allowance for that opening. The labor rate applies only to fenced length; include gate installation, brace assemblies, concrete, fixings, transport, tax or other work in gate-row amounts or the separate lump sum when you want them represented.

A named junction counted once is an input assumption, not proof that one post can safely support the connected runs or gates. UGA Extension distinguishes line posts and the end/corner/gate assemblies needed by different systems. This calculator does not choose those assemblies, their foundations, wire tension or spacing. It also cannot determine a unique perimeter from an acre count; measured plot area and a checked layout remain separate tasks.

A few questions, answered

How do I represent two fences that meet at one corner?

Use the same endpoint ID on both rows, such as A B 20 fence and B C 12 fence. B is counted once. Different IDs are always treated as different physical posts, even if you intended them to represent the same place.

Can a post be shared by two adjacent gate openings?

Yes, if you deliberately reuse its ID. A–B gate and B–C gate use three unique gate endpoints. The calculator does not determine whether the shared post is structurally suitable.

Does allowance add more posts?

No. The allowance applies to infill length only, before rounding to whole coils or rolls. Post quantities follow named endpoints and the entered maximum span assumption.

Can I enter disconnected runs or an open boundary?

Yes. Rows need not form a closed loop. No missing run is inferred, and naming a connected graph does not validate its real geometry or boundary.

Why is the result different from adding a straight-run calculator for every row?

A straight-run count includes both endpoints every time. Adding those counts can double-count shared endpoints, while a gate creates an opening with its own endpoint requirements. This planner separates those contributions explicitly.

Find your calculator

Start typing to explore the library.