One sided standardized CUSUM control chart calculator

A small persistent process shift can be hard to see in isolated observations.

Your numbers

Enter the stated row or dataset format. No missing cells or thousands separators. Keep observation order where it represents pairing or time.

Calculated on your device. Your inputs aren’t sent to us.

Your result

Ready when you are

Enter your inputs and select Calculate.

Try it, understand it

Explore the result

A small persistent process shift can be hard to see in isolated observations. A one-sided cumulative-sum chart accumulates evidence in one chosen direction after subtracting a reference allowance.

Worked example comparison
ExampleOutputWhat to notice
Worked exampleMaximum standardized one sided CUSUM2Four observations of one, with target zero, sigma one and k equal to 0.5, add 0.5 at each step. The upward accumulator is 0.5, one, 1.5 and two. With h equal to one, the first strict crossing is the third point, not the second. A downward chart on the same positive sequence stays at zero.
Compare a changed assumptionMaximum standardized one sided CUSUM0Reverse the monitored shift direction on the same positive observations.

Check your understanding

Does equality with h signal in this implementation?

No. The displayed rule is a strict crossing C greater than h.

Predict the comparison before running it

Reverse the monitored shift direction on the same positive observations.

Behind the numbers

How this calculation works

A small persistent process shift can be hard to see in isolated observations. A one-sided cumulative-sum chart accumulates evidence in one chosen direction after subtracting a reference allowance. This page follows a standardized tabular CUSUM through the entered observation sequence. It shows the first decision-limit crossing and continues the calculation without automatically resetting after a signal.

THE FORMULAC0=0; Cup=max(0,Cprevious+z−k); Cdown=max(0,Cprevious−z−k); signal if C>h

A worked example

Four observations of one, with target zero, sigma one and k equal to 0.5, add 0.5 at each step. The upward accumulator is 0.5, one, 1.5 and two. With h equal to one, the first strict crossing is the third point, not the second. A downward chart on the same positive sequence stays at zero.

Good to know

Independent constant-variance observations and a valid baseline are assumed. Subgroup means require their own standard-error scaling and cannot automatically use the individual sigma field unchanged. No baseline fitting, reset policy, multiple-chart false-alarm adjustment or production-control approval is included. Investigate signals using the actual process and measurement context.

What this calculation answers

A small persistent process shift can be hard to see in isolated observations. A one-sided cumulative-sum chart accumulates evidence in one chosen direction after subtracting a reference allowance.

This page follows a standardized tabular CUSUM through the entered observation sequence. It shows the first decision-limit crossing and continues the calculation without automatically resetting after a signal.

The EWMA control chart with finite startup limits calculator also remembers earlier observations but uses exponential weighting rather than a one-sided accumulated allowance.

Use the right input conventions

Observation order represents time and must be preserved. The target mean and individual-observation sigma come from a separately established baseline, not from the same monitored sequence by default.

Reference k and decision h are in standardized sigma units. Upward and downward charts use different signed increments; selecting one direction does not simultaneously evaluate a two-sided alarm rule.

Interpret the result

The accumulator never falls below zero because evidence opposite to the chosen direction erases the current run of accumulated evidence. A point signals only when C is strictly greater than the entered h.

The maximum statistic and first crossing describe the entered chart. They do not supply an average run length, false-alarm calibration or proof that a process has become unstable for a known reason.

Work through the example

Four observations of one, with target zero, sigma one and k equal to 0.5, add 0.5 at each step. The upward accumulator is 0.5, one, 1.5 and two.

With h equal to one, the first strict crossing is the third point, not the second. A downward chart on the same positive sequence stays at zero.

Where the model stops

Independent constant-variance observations and a valid baseline are assumed. Subgroup means require their own standard-error scaling and cannot automatically use the individual sigma field unchanged.

No baseline fitting, reset policy, multiple-chart false-alarm adjustment or production-control approval is included. Investigate signals using the actual process and measurement context.

A few questions, answered

Does equality with h signal in this implementation?

No. The displayed rule is a strict crossing C greater than h.

What changes in the comparison?

Reverse the monitored shift direction on the same positive observations.